Clothing samples: cost, timing and approval
· 2 min read
A clothing sample is quoted for your specific project rather than at a fixed price, so ask what the quote covers, how many revisions it includes, and whether any of the cost is credited against the production order.
On this page
Why does one clothing sample cost more per piece than production?
The first sample can include pattern development, material sourcing, cutting, sewing and adjustments for a single garment. In production, some preparation costs are spread across a run. Multiplying the published production price by one is therefore not a reliable sample budget.
Ask for an itemised sample quote. Splot quotes the sample for the agreed project rather than publishing one price for every garment. Any credit of the sample cost against a production order is agreed in the quote, so ask for the amount and the conditions in writing.
Is a free tech pack the same as a free sample?
No. A tech pack is the document describing the garment. A physical sample is the garment made from that specification. Splot offers a free tech pack, but that does not make pattern development, physical samples or shipping automatically free.
If you already have a reference garment, say whether it is a fit reference, a fabric reference or both. Ask where to send it before posting it. A reference helps describe the result; it does not replace an agreed specification for your own product.
What should a sample quote include?
Ask which of these items are included and which are separate:
- Pattern development and any grading beyond the sample size.
- Fabric, lining, ribbing, fastenings and other trims.
- Print or embroidery setup and the decoration itself.
- Neck labels, care labels and their setup quantities.
- The number of samples, included revisions and shipping.
- The amount credited to a production order and any conditions.
A lower sample price is not necessarily a lower development cost if every change becomes an additional invoice. Agree the revision scope before work starts.
How long does sampling take?
Splot confirms the sampling schedule for each project before approval, so there is no single figure to plan around. Ask when the clock starts and whether material procurement, revisions and delivery are included. A missing specification or unavailable trim can affect the schedule.
Production starts after sample approval, so the production lead time is not the complete time from the first email to delivery. Work backwards from your required delivery date and allow for decisions and revisions as well as manufacturing.
What should I check before approving the sample?
Check the sample against the agreed specification, not only against a photograph. Review fit, measurements, fabric, colour, construction, decoration and labels. Agree measurement tolerances and a suitable care or wash check with your production partner.
Record any substitute material or unfinished detail. A sample made to assess fit in a substitute fabric is not approval of the final fabric, colour or finishing. If the production material changes, agree what needs to be checked again before cutting the order.
Send one consolidated set of comments with photographs and measurements. Identify the sample version and specification revision you are approving, and keep that record for production inspection.
What should happen before bulk production?
Confirm the approved specification, final sample status, size and colour quantities, total price, payment terms and delivery plan. Open issues should be resolved or explicitly recorded before production is authorised.
For the quantity breakdown, read minimum orders, sizes and colours. For a garment that still needs defining, request a free tech pack. For an existing brief, ask for a sample and production quote.