Import duty follows the customs code and the code follows the construction, which is how a pocket below the waist took a Columbia blouse out of the blouse heading and cut its duty from 26.9% to 16%.

On this page
  1. How did a pocket cut the duty on a Columbia blouse?
  2. What decides the import duty rate on a garment?
  3. Which construction details change a garment's customs code?
  4. Is designing a garment to fit a cheaper customs code legal?
  5. How do you know what a garment will classify as before you produce it?
  6. Are the Columbia duty rates still current?

How did a pocket cut the duty on a Columbia blouse?

By changing what the garment was in customs terms. Columbia was paying 26.9% duty on a blouse. A pocket was added below the waist, big enough for a chapstick, and the garment stopped classifying as a blouse. The rate fell to 16%, eleven points lower.

Same fabric, same factory, same shirt. The only change was a construction detail, and that detail moved the garment from one customs heading to another.

The two rates come from a historical case, not from today's tariff schedule. They are here to show the mechanism, which still applies, rather than the current numbers, which do not.

What decides the import duty rate on a garment?

The customs code, and the construction decides the code. The rate is not set by what you call the garment on your website or your invoice. It is set by the heading the garment falls into, and the heading follows how the garment is made.

Customs classification works through a hierarchy of headings. Clothing is divided first by whether it is knitted or woven, and then by narrower features of type and construction, and each heading carries its own rate. A detail that looks minor to a designer can be the feature that decides which heading a garment ends up in.

Which construction details change a garment's customs code?

The ones its heading turns on. In the Columbia case, four details mattered:

detailwhy it matters
Knit or wovenknitted and woven garments sit in different parts of the tariff
Fibre splitthe composition can decide which heading or rate applies
Front openingwhether the garment opens down the front
Pocket below the waistheading 6206 covers blouses, and a pocket below the waist takes a garment out of it

These are construction decisions, normally made at the sketch stage by somebody who has not been told they are also setting a tax rate. That is the real lesson of the case. Your designer is setting your duty rate, whether or not either of you knows it.

The same move has been made from the other end in footwear. Converse put felt on the outsole of a sneaker so that it classified as a slipper, a difference worth somewhere around 25 to 30 points depending on the line. The principle is identical: the code follows the construction.

Yes, within a narrow line. You are allowed to build a product so that it fits a cheaper heading. You are not allowed to describe it as something it is not. The US Supreme Court settled the principle in the 1800s, in a case about sugar.

The line between tariff engineering and misdescription is real and it is narrow. Two things put a brand on the wrong side of it: declaring a garment as something its construction does not support, and adding a feature that is never actually there in the goods that ship. A pocket that appears on the spec and the sample but not on the production garments is not engineering. It is a false description of the goods.

How do you know what a garment will classify as before you produce it?

Ask for a binding ruling. You send customs the spec and the sample before production is set up, and they tell you in writing what the garment classifies as.

Doing it in that order is the cheap way round. Finding out after the containers have landed, when duty is already due on a classification you did not expect, is the expensive one. A ruling also gives you something firmer than an opinion to rely on if the classification is questioned later.

It is worth the effort most on a style you expect to run for several seasons or in volume, where a few points of duty on every unit add up across every shipment.

Are the Columbia duty rates still current?

No. 26.9% to 16% is the historical Columbia case, not today's schedule. Rates have moved a great deal recently, and the rates on your own garments will not be those two.

That does not weaken the point. A duty rate is a consequence of construction, not a fixed fact about a market or a product category. Almost nobody in a small brand has asked what their rate is a consequence of, and much of the answer sits in the tech pack.

What to put in the tech pack

  • State knit or woven, the full fibre composition, the front opening and the position of every pocket clearly, since these are the details classification can turn on.
  • Ask your factory or customs broker what your main style classifies as, and what the rate beside that code costs.
  • If a construction change would move the code, decide it at the sketch stage rather than after production.
  • For a style you will run repeatedly, get a binding ruling on the spec and sample before you produce.
  • Declare only features the shipped goods actually have.

Duty is one of the costs an ex-works quote leaves with the buyer; for how it adds up on an order, see what a first clothing production order really costs. A free tech pack is where the construction details get written down.

Keep reading

Ask us about yours.

Tell us what you want made and we will tell you what it takes before you commit to anything. The quote is free.